Fast strength gain screed (sometimes referred to as fast curing screed) is ideal in situations where ‘down time’ is not an option.  Rapid strength screeds mean keeping to strict programs.

We work with commercial and domestic clients in supplying and laying these screeds.  Commercial developments often require this kind of performance from their screed, needing to load it as a very early stage.  An example of this fast strength-gain screed being used to benefit a commercial project is in shop fitting.  The requirement is often that a screed is to be laid with floor coverings in place as soon as possible, ready for the shops regular foot fall. Using a fast strength-gain screed means that the screeding element holds the programme up by less than 24hours.

During winter rapid strength screeds are often used to combat the low temperatures to ensure that work continues as normal, when traditional screeds strength gain slows.

Let Speed Screed provide the solutions to your site-based screeding problems.

fast strength gain screed, rapid strength screed, fast curing screed fast strength gain screed, rapid strength screed, fast curing screed

Quote MeB1G1

Get in Touch

5 Ebor Court, Randall Park Way,
Retford, Nottinghamshire, DN22 7WF
0800 242 5589
info@speed-screed.com

Office Hours:

Monday to Friday 08.00 – 17.00  Online Chat 24/7

About Speed Screed

Speed Screed Limited was founded on the key principle of providing first-class customer service. It has since built itself an impressive reputation for delivering high-quality projects across the United Kingdom.
The company’s success is built on its belief in quality work, attention to detail, on-time completion, strong working partnerships and the recruitment of top-level staff. about us >