Should there be surface water on newly laid screed?

Should there be surface water on newly laid screed? I'm Andy Parkin Managing Director of the Multi-Award Winning Speed Screed. Thank you very much for your question, Dee. Your question is: “Should there be surface water on newly laid screed" Watch Andy's video to find out his answer: https://youtu.be/iC25jBj4BHA I will take that it [...]

By |2021-11-15T16:52:47+00:00November 15th, 2021|Ask Andy, liquid floor screed|0 Comments

Lincoln Liquid Screed And Underfloor Heating

Lincoln Liquid Screed And Underfloor Heating Working with our good friends at J L Construction.  They are a Retford based building company with a reputation for high-quality work. The project consisted of 22m2 of underfloor heating fitted and installed by Speed Screed.  Gypsol Rapide liquid screed was laid at 50mm nominal depth.  With its fast-drying [...]

Liquid Screed Wokingham

Liquid Screed Wokingham This renovation project is in Finchampstead, Wokingham.  The specification was a liquid screed to cover the water underfloor heating system.  High thermal conductivity was a high priority, and Axtell Concrete supplied Gypsol Classic liquid flowing screed. The project size was 80m2 at a depth of 55mm. Thank you, Murray & Krzysztof, for [...]

How Deep Should Liquid Screed Be Over My Wet Underfloor Heating?

How Deep Should Liquid Screed Be Over My Wet Underfloor Heating? I'm Andy Parkin Managing Director of the Multi-Award Winning Speed Screed. Thank you very much for your question, Julie. Your question is: “How deep should the liquid screed be over my wet underfloor heating?" Watch Andy's video to find out his answer: https://youtu.be/NtuZT5XOq6A [...]

Cemfloor Flowing Liquid Screed Edinburgh

Cemfloor Flowing Liquid Screed Edinburgh This domestic project in Edinburgh needed a thermally conductive screed to efficiently work with their new water underfloor heating system.  Cemfloor Flowing Liquid Screed was the perfect product. The scope of the works was 80m2 x 50mm screed depth. Aggregate Industries supplied the Cemfloor Flowing Liquid Screed from their local [...]

By |2021-07-27T11:27:39+00:00July 27th, 2021|liquid floor screed, Screed Case Studies|0 Comments

Ask Andy “Floating Screed Over Insulation. What Is The Minimum Depth Allowed?”

Ask Andy "Floating Screed Over Insulation. What Is The Minimum Depth Allowed?" I'm Andy Parkin Managing Director of the Multi-Award Winning Speed Screed. Thank you very much for your question, Alex. Your question is: “If I do a floating screed over Celotex insulation, what is the minimum depth allowed?” Watch Andy's video to find out [...]

By |2021-07-21T11:11:05+00:00July 21st, 2021|Ask Andy, Floating Screed Over Insulation|0 Comments

Ask Andy “Supaflo Winter Drying Times”

Ask Andy "Cemex Supaflo Winter Drying Times" Thank you Daren for your Cemex Supaflo Winter Drying Times Question: "what is the drying times calculation for a 50mm supaflo screed in an unheated internal space using winter temps and RH?" Watch Andy's video to find out his answer: https://youtu.be/60NMcBSLwZQ Would you like to find out [...]

By |2021-02-11T18:37:17+00:00February 11th, 2021|liquid floor screed, Screed Case Studies|0 Comments
Go to Top